Testing Commissioning 115 KV GIS

Reading Scheme OF GIS Drawing , Make Interface with Protection And Control Scheme
4.58 (83 reviews)
Udemy
platform
العربية
language
Engineering
category
Testing Commissioning 115 KV GIS
358
students
6 hours
content
Feb 2024
last update
$44.99
regular price

What you will learn

Wire Specification And Ferrouling System OF GIS Bays

SF6 GAS Scheme Diagram For All GIS Compartment

The Distribution OF DC Power Supply

Close Circuit Breaker From SAS Operating System and Emergency

The Different Between Service Position OF Circuit Breaker And Maintenance Position

Modification OF Maintenance Position In LCC Drawing

Synchronization Conditions For Circuit Breaker

The Important OF Trip Circuit Supervision For Circuit Breaker

Philosophy of Trip With Mechanical and Electrical Protection

High Impedance BusBar Protection Theory

The Important OF Using Early Make And Late Break Contact For Bus Disconnector

High Impedance BusBar Protection Zone (Discrimination Zone And Check Zone)

Philosophy of Trip For BusBar Protection

Circuit Breaker Fail Protection Theory

Philosophy of Trip For Circuit Breaker Fail Protection

Philosophy of Interlock To Ensure the Safe Operation OF The Stations

Philosophy of Interlock Between HV circuit Breaker And Earth Disconnector in Low Voltage Side

SF6 Alarm For All GIS Compartment

AC And DC Supervision Alarm

Screenshots

Testing Commissioning 115 KV GIS - Screenshot_01Testing Commissioning 115 KV GIS - Screenshot_02Testing Commissioning 115 KV GIS - Screenshot_03Testing Commissioning 115 KV GIS - Screenshot_04
4447944
udemy ID
12/16/2021
course created date
1/2/2022
course indexed date
Bot
course submited by